Membrane Wall
Membrane wall panels for water-tube boiler furnaces and gas passes.

- Panel geometry
- Openings and bends
- Installation and joints
- Project-specific design
Membrane wall solutions for water-tube boilers
Panels are engineered for boiler geometry, tube layout, connections, openings and site installation. Panel dimensions, bends and joints are defined from application data.
Panel geometry
Tube layout and dimensions follow the boiler design.
Openings and bends
Passages, corners and connections are assessed.
Installation and joints
Panel joints and installation sequence follow site conditions.
Project-specific membrane panel fabrication
Fabrication, connections and installation details are developed from project data and plant conditions.
Applications
- Water-tube boilers
- Biomass boilers
- Fluidized bed boilers
- Power plants
- Waste heat boilers
- Boiler rehabilitation
From project data to site-ready manufacturing
Data analysis
Process and site requirements are assessed.
Engineering
Layout and connection details are defined.
Manufacturing and implementation
Fabrication and site work are planned together.
Information for a quotation
Boiler geometry
Include the dimensions and any available technical or connection drawings.
Let’s find the right solution for your project.
Share your operating data and site conditions so we can review the technical scope together.